Wednesday, August 16, 2017

Roofed Breezeway Update

So I have been puttering away on the breezeway project the last few days, got the soffit and fascia all done and started on the end enclosures. Completed the back today, just needs stain and a top hung sliding door. The door will be similar to the enclosure 2/3 panel and 1/3 privacy lattice. I went with resin plastic privacy lattice, it is 3 times the price of treated wood lattice but I find the wood doesn't last and looks terrible after a few years. I covered the base panels with that used siding I had left. I should have enough left to do the 4 bottom panels on the front and back. The top front I have yet to decide on a finish, moisture is not as much of a problem so maybe just stain. Here are some pictures.




Hopefully I can finish the front this weekend, then I have a week of stain and paint to finish, on the porch and breezeway. I have yet to pour a 2' X 20' concrete apron along the front as well.