Friday, June 15, 2018

Hoist Ready For Metal Work

So I spent a couple of hours cutting and installing the two trim pieces yesterday, to square up the bottom of the wood H beam. The built up beam feels solid as a rock, to the whack of the hammer.

The first picture is the right side post, if you look behind the post you can see how the beam looks before adding the trim pieces.


Left Side


So here is the 6" I beam delivered this morning. I will need 9'1", which leaves 11' for one or two other projects.


So I am ready to do the steel work. To many errands and stuff today but hopefully we will get it cut, drilled, welded, and installed this weekend.